Consulting Services for the Update of Existing Studies on Poko and Bakaru II Hydropower Projects in Indonesia
Small Opportunity Size
Deadline not specified
support of KfW and the World Bank in developing
the green-field Poko Hydropower Project and an
extension of the downstream located and existing
Bakaru Hydropower Plant, the Bakaru II
Hydropower Project, on Mamasa River in Western
Sulawesi. A feasibility study on Poko Hydropower
Project was completed in 1997 and a detailed
design report on Bakaru II Hydropower Project in
1998, however, neither of the existing studies
envisaged a cascade development of the two
projects.
The required Consulting Services comprise the
update of the existing studies on both Poko and
Bakaru II hydropower projects taking into account a
combined development of the two projects.
。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。
上記の入札公示は、去年の4,5月ごろか。今気付いた。
なるほどね。いいじゃない。
僕が考えていた最適案が出てきたね。下流の流れ込み式の堆砂問題は、上流に貯水池タイプのダム発電所を築いて、何とか解決させるしかないんですね。
知っていたけど、元いた会社諸君には伝えなかった。どうせお馬鹿さんだからね。
PLNも気付くのに一体何年かかったんでしょうかね。
もう公示から1年以上たったけど、どこが取ったかはまだ分からない。
0 件のコメント:
コメントを投稿